SpaceX Expands Beyond Rockets With $74 Billion AI Infrastructure Push
SpaceX plans to invest more than $74 billion in two artificial intelligence supercomputing campuses in the United States, with projects proposed in Texas and Arizona as the company expands its computing infrastructure beyond its traditional rocket and satellite businesses.
The company outlined plans on November 12 for an investment exceeding $24 billion at its Starbase site in South Texas and approximately $50 billion for a separate campus in Cochise County, Arizona. The projects would provide additional computing capacity for SpaceX’s expanding AI operations. Reuters reported the investment figures following a company statement.
The proposed spending makes the two campuses among the largest announced AI infrastructure projects, although the figures represent planned investment rather than money already spent.
Arizona campus accounts for roughly $50 billion
The larger of the two proposed developments is in Cochise County, Arizona, where SpaceX plans to invest approximately $50 billion.
County planning documents provide a more detailed picture of the proposed development. The application for the US Highway 191 Data Center Campus describes a project covering approximately 747 acres, with as many as nine computing buildings to be developed in four phases.
The proposal also includes battery energy storage systems and supporting electrical and cooling infrastructure. Its estimated electricity demand could reach 6 gigawatts at full build-out, according to the county’s project information.
The scale of the proposed power requirement makes electricity supply a central issue for the development.
SpaceX has said it is working with local electric cooperatives and that the project could reduce electricity bills for cooperative members by as much as 20%. The company has also said the Arizona facility would use dry cooling, with no planned industrial groundwater consumption. These are company projections and commitments, not independently established outcomes.
The project has not yet received final county approval.
Cochise County’s Planning and Zoning Commission is scheduled to consider the special-use application at a public hearing on December 9, 2026. The commission can approve the application, impose conditions, or reject it. Its decision may be appealed to the county’s Board of Supervisors under the applicable zoning regulations.
Local opposition has also emerged. Reuters reported that a petition carrying approximately 2,400 signatures asked county officials to reject the development.
Texas campus will have its own power supply
The second project is planned for SpaceX’s Starbase site in South Texas, with an estimated investment exceeding $24 billion.
Unlike the Arizona development, the Texas facility is expected to generate its own electricity rather than rely on the public power grid.
A notice from the Starbase City Commission described plans for a natural gas-fired power plant alongside the supercomputing facility on approximately 444 acres. The arrangement would give the campus a dedicated electricity supply for its computing operations.
The project has already generated employment during its development phase.
SpaceX told Reuters that construction activity associated with the Texas project had created more than 3,000 jobs. The company expects the operational facility to support more than 500 permanent positions.
The Starbase City Commission is also scheduled to consider a property tax abatement for the project on December 9.
AI is becoming a larger part of SpaceX’s business
The proposed campuses reflect a broader shift in SpaceX’s business strategy.
The company, led by Elon Musk, has traditionally been known for its Falcon rocket launches, spacecraft development and Starlink satellite internet network. Its AI operations have become a much larger part of its business following the expansion of its computing infrastructure and its integration with Musk’s wider AI ambitions.
Reuters reported that SpaceX’s AI segment generated more than half of the company’s revenue in the third quarter of 2026. That figure suggests AI has become a central revenue contributor rather than simply an additional technology activity.
The company’s computing expansion is also supported by a separate financing arrangement announced in October.
On October 26, SpaceX disclosed a commitment to enter into an approximately $40 billion master finance lease for graphics processing units (GPUs) and related equipment. The arrangement, involving an entity managed by Apollo Global Management, is intended to supply Nvidia’s next-generation Vera Rubin chips for SpaceX’s terrestrial computing infrastructure.
SpaceX said the financing was backed by several financial institutions, including Apollo and Goldman Sachs, with commitments also involving funds managed by BlackRock and Goldman Sachs Asset Management, as well as capital accounts advised by KKR.
The company expected the lease to close before the end of 2026, subject to specified conditions, with equipment deliveries and lease schedules expected to begin in the first half of 2027.
The $40 billion financing commitment should be distinguished from the newly announced $74 billion campus investment. They describe different elements of the company’s computing expansion and should not automatically be added together as separate project spending.
Energy and local approval remain key challenges
The proposed developments also bring attention to the infrastructure demands of large AI computing facilities.
Supercomputing campuses require substantial electricity to operate processors and supporting equipment, as well as cooling systems to manage the heat generated by high-performance hardware.
The two SpaceX projects have different approaches to these requirements. The Texas facility is expected to have dedicated natural gas power generation, while the Arizona proposal involves cooperation with local electric utilities and dry-cooling technology.
For Cochise County, the approval process will be particularly important because the proposed development involves a large rural site and an electricity requirement estimated at several gigawatts.
The county’s review will determine whether the project can proceed under the proposed land-use arrangements. Public participation and the concerns raised by residents will form part of that process.
SpaceX has not provided a complete public construction timetable for both campuses in the reporting available for this article. Their final development schedules, approval conditions and operational capacity therefore remain subject to further decisions and disclosures.
For now, the $74 billion plan signals the scale of infrastructure SpaceX intends to build as it competes in the increasingly capital-intensive AI computing market.
