November 26, 2026

Mumbai Water Cut November 26 – 5 Critical Details as BMC Announces 24-Hour Shutdown

Mumbai water cut November 26, Mumbai water supply news, BMC water shutdown

MUMBAI: Mumbai water cut November 26 is expected to affect several neighbourhoods across six municipal wards as the Brihanmumbai Municipal Corporation (BMC) undertakes major pipeline repair work between Powai High-Level Reservoir No. 1 and Sahar Village. The 24-hour disruption will begin at 9 AM on Thursday, November 26, and continue until 9 AM on Friday, November 27, 2026.

During the maintenance period, several localities will experience a complete water supply shutdown, while others will receive water at reduced pressure. Areas around Dharavi, Mahim, Andheri, Bandra East, Vikhroli and Bhandup are among those expected to be affected.

According to The Indian Express, the repairs will cover major pipelines connecting the Powai High-Level Reservoir with Sahar Village.

1. Mumbai Water Cut November 26: Check The Shutdown Timings

The scheduled maintenance will last 24 hours, beginning at 9 AM on November 26 and ending at 9 AM on November 27.

The repair work involves major water pipelines between Powai High-Level Reservoir No. 1 and Sahar Village. The work is intended to address leakages along the pipeline network.

The disruption will not affect every locality in the same way. Some areas will experience a complete interruption, while others will receive reduced-pressure supply during the repair period.

Residents should also remember that the restoration of normal supply may take longer than the official shutdown window.

2. Dharavi, Mahim And Matunga Among Affected Areas

Several localities in G North ward will experience a complete water supply interruption.

The affected areas include:

  • Dharavi Loop Road

  • A K G Nagar

  • Prem Nagar

  • Naik Nagar

  • Dharavi Main Road

  • Ganesh Mandir Road

  • Mahim Phatak

  • Kumbharwada

  • Matunga Labour Camp

  • Sant Rohidas Marg

These locations are among the areas listed for water supply suspension during the maintenance operation.

Residents in these neighbourhoods should arrange sufficient water before the repair work begins.

3. Andheri, Marol And Airport Areas To Face Disruption

Parts of K East and K West wards will also experience water supply interruptions.

Affected localities include Marol, MIDC, Chakala, J B Nagar, Sahar and Airport Road.

Important facilities and locations expected to experience disruption include:

  • Chhatrapati Shivaji Maharaj International Airport

  • SEEPZ

  • Seven Hills Hospital

  • Sahar Village

  • Om Nagar

  • Kanti Nagar

  • Cargo Complex

The disruption will vary depending on the location and the scheduled repair work.

Some localities, including Koldongri, Vijay Nagar and Mogarpada, are expected to receive water at reduced pressure rather than face a complete shutdown.

4. Bandra East, Bhandup And Vikhroli Also On The List

The BMC water shutdown will extend to parts of H East, S and N wards.

In H East ward, Bandra Terminus is listed for a water interruption on both November 26 and November 27.

Other affected localities include:

  • Behrampada

  • Kherwadi

  • Kher Nagar

  • Nirmal Nagar

  • Parts of Bandra East

In S ward, the affected locations include Morarji Nagar, Gautam Nagar, Jai Bhim Nagar, Paspoli Village, BEST Nagar, Filterpada, Pathanwadi and parts of Aarey.

Some areas in Vikhroli West, Kanjurmarg West, Surya Nagar and Bhandup will experience reduced water pressure.

Parts of N ward, including localities around Vikhroli West railway station, Firoz Shah Nagar, Godrej Compound, Mayfair buildings, Kailash Complex, R City Mall, Presidential Towers and Sainath Nagar, are also listed for low-pressure supply on November 26.

5. BMC Water Shutdown: Residents Advised To Store Water

The scheduled maintenance could affect households, commercial establishments, hospitals and other facilities that depend on a regular municipal water supply.

Residents in affected neighbourhoods should make arrangements before 9 AM on November 26.

Storing sufficient water for drinking, cooking, cleaning and other essential household requirements can help reduce difficulties during the interruption.

The BMC water shutdown may also have consequences after the repair work is completed. Water pressure could remain lower than usual, and some localities may receive turbid or muddy water for three to four days following the maintenance.

Residents have been advised to filter and boil drinking water before consumption as a precaution.

Households should avoid assuming that the supply will immediately return to normal once the 24-hour repair period ends.

When Will Normal Water Supply Resume In Mumbai?

The scheduled repair operation is expected to finish at 9 AM on November 27. However, the restoration of normal pressure and water quality may take additional time in affected localities.

The civic body’s maintenance work is aimed at addressing pipeline leakages along an important section of Mumbai’s water distribution network.

For residents, the immediate priority is to store adequate water, monitor local supply conditions and follow the civic body’s drinking-water precautions.

The Mumbai water cut November 26 announcement is particularly important for households and businesses in Dharavi, Andheri, Bandra East, Vikhroli and surrounding localities, where the interruption could affect daily activities.